Sysman Informatikai Zrt.
Server consolidation, storage consolidation, monitoring system
Migration
IT operation, Outsourcing, HelpDesk and Desktop Support service
Backup
Archiving
Disaster Recovery
IT Server room moving
IT audit, infrastructure optimization, system planning
IT consulting, project management
APEH
CIB Bank
Csemege–Match Ker. Rt.
Deloitte and Touche
E.ON Hungary
EXIMBANK
HP Hungary
Hungarocamion Rt.
Hungarian National Bank
MÁV, MÁV Informatics
Microsoft Hungary
Ministry for Education
MOL Rt.
National Frontier Guard
National Highway Rt.
National Lottery Co. (Szerencsejáték Zrt.)
Nuclear Power Station of Paks
Pannon GSM
Raiffeisen Bank
Richter Gedeon Pharmaceutic Factory
Silicon Laboratories Hungary
State Emloyment Service
Stock Exchange of Budapest
Stratis Informatikai Kft
T-Mobile Hungary
UPC Hungary
Vodafone Hungary
magyar english

IT audit, infrastructure optimization, system planning

Ministry for Education

After a multi-cycled bidding period our company signed contract with Ministry of Education in May, 2003 in which Sysman was charged with IT audit activity in the subject of ”Participation in the overall professional monitoring and IT audit of National Information Infrastructure Development Office.” The goal of the project was the full revision of the Ministry’s paper-based document production from logistics, security and operational costs point of view.

Nuclear Power Station of Paks

Sysman was mandated by Hungarian Power Companies Ltd. for the audit of the critical systems of Nuclear Power Station of Paks and for preparing a mid-term development conception of the Unix systems. Scope of the project: application assessment, identification of application modules, analysis of business requests and the workout of an error-proof architecture of good operability based on the assessments.

Vodafone Hungary

Billing Hardware Upgrade project. Planning and implementation of server, hardware and operating system upgrade project of the business critical billing system of Vodafone (Amdocs) and the coordination and support of the migration activities.

Oracle RAC/DataGuard configuration implementation giving the infrastructure of Voucher On-Line system of Vodafone.

National Lottery Co. (Szerencsejáték Zrt.)

During the analysis Sysman assessed firstly the national betting system’s central technical elements. The assessment affected the betting system’s main components (data storage subsystem, servers, backup and monitoring system). The attributes, configuration and performance data of betting system and its subsystems also were analyzed. We gave a forecast on the actual support possibility and lifecycle of each subsystem. Following that we prepared a risk analysis containing the risk regarding the extant architecture and the architecture changing. At the end of the project we gave a proposal for the schedule and content of infrastructure development.


Information on ISO 9001:2008 standard
2008-11-27 18:00
ISO (International Organization for Standardization) released the ISO 9001:2008 standard on 2008. November 15. As we announced in an earlier newsletter the new standard does not includes new requirements, only minor modifications were made in the text serving the simpler understanding.
More »
Sysman on TV.
2008-11-27 17:14
From December 1. the commercial spot of Sysman is on MTV1 and MTV2-n. In case you missed it, the spot is available in the Press section.
More »
At last our webpage has renewed!
2008-11-27 17:11
After a long preparation work, and I can see after a so-called suffering, at last we have our webpage renewed. Hopefully everybody find it better to use thanks to the new structure. Remarks are welcome…
More »
 
Webdesign: Webmasters-Informatika Kft.